How long until a direct care practice pays for itself?
There are two answers, and they are months apart. The first is the month the practice stops losing money. The second is the month it has earned back everything it lost getting there.
Why a new practice starts behind
Overhead is close to full size from the first day. The panel is not. Members join over months, so revenue climbs gradually toward a level that overhead reached immediately. The stretch in between is the ramp period.
A worked example
Take a practice with:
- $15,000 a month in overhead
- A $90 monthly membership fee
- A target of 400 members, reached at a steady pace over 18 months
Break-even is 167 members ($15,000 ÷ $90). Here is how the first year and a half plays out:
| Month | Revenue | That month | Running total |
|---|---|---|---|
| 1 | $1,980 | −$13,020 | −$13,020 |
| 7 | $14,040 | −$960 | −$49,020 |
| 8 | $16,020 | +$1,020 | −$48,000 |
| 12 | $24,030 | +$9,030 | −$24,030 |
| 15 | $29,970 | +$14,970 | +$14,940 |
| 18 | $36,000 | +$21,000 | +$72,000 |
Milestone one: the first profitable month
In month 8, revenue passes overhead for the first time. This is the month people usually mean by "break-even", and it feels like the finish line. It is not. The practice is still $48,000 behind.
Milestone two: earning it back
The running total turns positive in month 15. Only then has the practice repaid its own early losses. In this example that is seven months after the first profitable month.
The lowest point of the running total, about $49,000 in month 7, is the cash you need on hand just to get through the ramp. It sits on top of your one-time startup costs and your own living expenses. See what it costs to open.
What if growth is slower?
Every plan should be run more than once. Using the same practice:
| Scenario | First profitable month | Losses earned back | Lowest point |
|---|---|---|---|
| Slower: growth takes 50% longer, overhead 10% higher | Month 13 | Month 24 | −$93,960 |
| As planned | Month 8 | Month 15 | −$49,020 |
| Faster: growth 25% quicker, overhead 10% lower | Month 6 | Month 10 | −$28,890 |
The slower case needs almost twice the cash of the plan. If you could not fund the slower case, that is worth knowing before you sign a lease.
What moves the dates
- Members on opening day. A waiting list that converts moves every date earlier.
- Overhead in year one. Each dollar you delay spending shrinks the hole directly.
- The fee. A higher fee lowers the break-even panel, though it may slow enrollment.
Note that this example leaves out your own pay. Add what you need to take home to the overhead figure and every date moves later.
See your own two dates
Launch Planner runs your plan under these same three scenarios and shows the month each one earns back its losses.
Plan My Launch FreeFree plan, no credit card.
Keep reading
The numbers in this guide are worked examples, not benchmarks. Your fee, costs and pace of growth will differ, and nothing here is financial advice.